![]() Wadsworth Construction Company, LLC (RLW) worked as a subcontractor to HDJV Construction, a joint venture between Holder Construction and Big-D Construction. per piece and H-piles to lengths up to 120 feet, which required the team to splice piles together. ![]() The individual pipe pile lengths ranged from 60 ft. This complex construction program required more than 1,071 steel pipe piles and 1,517 steel H-piles to be manufactured, delivered and driven. This program is the most recent effort to transform Salt Lake City International Airport into one of the nation’s most efficient airports. It will be equipped with walkways, utilities, and a train (in future construction phases). The tunnel is 935 feet long and approximately 115 feet wide and is constructed completely under the runway. The second phase of the Salt Lake City Department of Airports (SLCDA) $3.6 billion redevelopment program will build the South Concourse East and the Central Tunnel to connect the South and North Concourses of the Salt Lake City International Airport. Published on September 22nd, 2022 | by PILEDRIVER Magazine | Is| Volume 20, No.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |